I Haven’t Got The Energy to Title Entries Anymore…

Here are some pictures of the last hours before my life became one long string of crisis-averting-decision-demanding-problem-solving occurrences, each of which usurps the one before it, which must then be kept in a neat queue and dealt with in turn…

IMG_3537

Lovely Craig sits by the fire pit and noodles away on his guitar.

IMG_3538

Anna finishes off the trench for the plumbing and electricity to reach the shower.

2015-09-06-16.34.30

And then does the plumbing, which is fully and totally successful and Anna deserves a medal. Later the electricians showed up and we now have a fully working shower.

 

IMG_3536

Last day before everyone else turned up and it all went mad. A lovely lunch for me,  Craig, Anna and Esther.

IMG_3539

First day of actual work, building sawhorses and putting up the marquee for cover.

PICT0001

It was a hive of activity.

PICT0002

Lovely to watch a great team of people getting on really well.

Meanwhile, for your amusement, here are some of the screw-ups I’ve dealt with in the last two days:

When Hywel delivered the first loads of timber and made a list of what he reckoned was there, it didn’t quite tally with Nora’s list, so she sent me a spreadsheet and I set Esther and Lisa to count it all, and their tally didn’t agree with either.  Still working on that one.

During all that, it came to light that I, through not having paid proper attention, only ever sent the house cutting list to Nora, so I have not even ordered the timber for the “link” bit, which means there’s a whole chunk of extra budget I didn’t budget for, but has a silver lining in that we don’t really have enough space to store that much timber anyway, so putting up one bit and getting it roofed and then using it as a workspace makes a lot of sense. And also, Nick designed the link in a way much more complicated than it needed to be because it was going to have to slot into the Hall when we built that, but I’m seriously, really not feeling up to building something that big now, so I think I will be redesigning it significantly smaller, therefore we can simplify the link design, which is obviously better done before timber gets ordered. But costs me more money. Sigh.

What Nora has been cutting for me has been quite rustic in quality, which I love from an aesthetic perspective, but is perhaps less useful when stuff is not quite as thick as it should be (probably fine in the end) or slightly less long than it should be (really not fine, though it’s only one piece that we have found) and also I failed to impress upon her the importance of having it all milled up and on site by the start of the framing, and between us we have managed to be so casual that we’re both now panicking and rushing to figure out how to get the right pieces here in time to make proper use of the paid professionals.

The stuff that Nora couldn’t cut, which is coming from a mill in Wakefield, is being delivered on Friday, but they took one look at the access road and declared that they couldn’t do it. Helpful. So I have arranged for them to come to the bottom of the hill and for a guy with a lorry that’s meant for transporting farm machinery and whatnot, but which can get 7-meter pieces of wood up our access road to do runs up the hill with the stuff. With a bit of luck that won’t all go horribly wrong on the day.

And a million other little things.

Yesterday nearly had me in tears. Which is not unexpected at all. I’m a bit like that.

Today I will try to chill out.